Copper Mountain Mine

Annual Operating Statistics

Production Guidance

  2021E
Copper (Mlbs) 85 to 95
Gold (koz) 25 to 35
Silver (koz) 500 to 550

Annual Operating Statistics

Mine Production Information
Copper Mountain Mine (100% Basis)
2020 2019 2018
Mine
Total tonnes mined (000’s)1 55,045 62,129 74,337
Ore tonnes mined (000’s) 14,173 12,496 20,567
Waste tonnes (000’s) 40,872 49,633 53,770
Stripping ratio 2.88 3.97 2.61
Mill
Tonnes milled (000’s) 14,336 14,643 14,535
Feed Grade (Cu%) 0.32% 0.29% 0.31%
Recovery (%) 78.0 77.8% 79.8%
Operating time (%) 92.4% 93.2% 92.6%
Tonnes per Day (TPD) 39,169 40,118 39,822
Production
Copper production (000’s lbs) 77,551 71,950 78,847
Gold production (oz) 29,227 26,478 26,799
Silver production (oz) 392,494 254,541 284,086
Total operating costs (C1) per pound of copper produced (US$) $1.43 $1.92 $1.77
All-in-sustaining costs per pound of copper produced (US$) $1.58 $2.06 $1.94
All-in cost per pounds of copper produced (US$) $1.90 $2.44 $2.33

1. Excludes ore re-handle from stockpile