Copper Mountain Mine

Annual Operating Statistics

Production Guidance

  2022E 2023E
Copper (Mlbs) 80 to 90 90 to 105

Annual Operating Statistics

Mine Production Information
Copper Mountain Mine (100% Basis)
2021 2020 2019
Mine
Total tonnes mined (000’s)1 56,897 55,045 62,129
Ore tonnes mined (000’s) 13,358 14,173 12,496
Waste tonnes (000’s) 43,540 40,872 49,633
Stripping ratio 3.26 2.88 3.97
Mill
Tonnes milled (000’s) 13,406 14,336 14,643
Feed Grade (Cu%) 0.38% 0.32% 0.29%
Recovery (%) 79.8 78.0 77.8%
Operating time (%) 91.9% 92.4% 93.2%
Tonnes per Day (TPD) 36,729 39,169 40,118
Production
Copper production (000’s lbs) 90,140 77,551 71,950
Gold production (oz) 28,736 29,227 26,478
Silver production (oz) 523,821 392,494 254,541
C1 cash costs per pound of copper produced (US$) $1.49 $1.43 $1.92
All-in-sustaining cost per pound of copper produced (US$) $1.84 $1.58 $2.06
All-in cost per pounds of copper produced (US$) $2.12 $1.90 $2.44

1. Excludes ore re-handle from stockpile